Construction of 400/33KV Al Jazzier Grid Station along with associated 400KV LILO from Ras Madraka Wind Farm Grid Station to Shaleem Grid Station
Eighteen (18) months excluding six (6) weeks for mobilization, from 13th October 2025
ZP.EP195
The Project Scope shall consist of:
A. Construction of 400/33kV Al Jazzier Grid Station and all associated works
- New 400/33kV Al Jazzier Grid station shall be constructed on turnkey basis (design,
supply, construction, installation, testing and commissioning) on the plot located s
in the southern part of Al Wusta governate and is around 120 km to the south of the
proposed Ras Madrakah Wind Farm grid station and around 200 km from the
Special Economic Zone of Duqm (SEZAD).
- 400kV GIS Grid Station shall be constructed under the scope of this tender within
the overall plot identified for 400kV GIS Grid Station at Al Jazzier which
including 0Nos of 400kV GIS bays with GIB, 2Nos of 63 MVA,400/33kV Power
Transformers with OLTC & RTCC and TMS panel, 400kV, 2 x 50MVAR Reactors for
Ras Al Madraka feeders including RMS, 1000kVA,33/0.415kV, ONAN, ZNyn11
Earthing Auxiliary Transformer (2Nos), 33kV GIS switchgear (Bus - A & B) consists of
15Bays, 400kV Control & Relay Panels, 33kV C & R Panels (with BCU), 2Nos. of 33kV,
10MVAr Capacitor bank, SCS system including Cyber Security system, RTU based
SCADA system, OLCM System, Telecommunication system, Integrated security
system, Fire Protection and Fire Alarm system, Roof Top Solar plant, EOT cranes
etc
B. 400kV OHL Loop In & Loop Out works about Route Length of 2 x 1km
- Existing 400kV Ras Madraka GS - 400kV Shaleem GS OHL circuits shall be Loop In
and Loop out at Al Jazzier 400/33kV Grid station including the construction of
Gantry, terminal towers, required angle towers, suspension towers etc.