Projects

GCCIA Tender 321-2024

Engineering, Procurement and Construction of 400KV Overhead Line Works for GCCIA Oman Direct Link Project

21 Months from the date of Award, from 06th October 2025
ZP.EP194

The Project Scope shall consist of:
Lot 3: Engineering, Procurement and Construction of 400kV Overhead Line Works between UAE/OMAN Border and GCCIA IBRI Substation, with a total route length of approx. 88 km

  • Route survey, data collection, obtaining preliminary NOCs
  • Soil investigation including soil resistivity measurement
  • Line design / drawings preparation, tower Spotting and optimization
  • Design, supply, construction of concrete reinforced pile foundations
  • Supply and erection of lattice steel tower structures.
  • Supply and installation of new ACSR/AW Finch Conductor 635.5 sqmm as necessary, complete with all accessories, as necessary.
  • Design, supply and installation of new composite shield-wires / OPGW (96 optical fibers) – 2 Wires,complete with all accessories
  • Design, testing, manufacturing, supply and installation of Insulator Sets complete with RTV Silicone Rubber Coated Glass/Porcelain Insulator Units and all fittings
  • Design, supply and installation of Aircraft Warning measures as per the requirements and regulations of concerned Civil Aviation Authorities in Oman, as well as with the applicable ICAO Regulations