Construction of 400kV Overhead transmission line from Duqm Industrial GS to Shaleem GS. (OETC 49-2023)
28 Months + 6 weeks from 27th Feb 2024
EP190
Construction of 400kV D/C delta configuration towers with Quad AAAC “Yew” conductor/Porcelain Long rod insulator Overhead transmission line from Duqm industrial Grid station to Shaleem GS for route length of 280kms. Modifications to existing 132 kV OHL for facilitating crossover of the 400 kV OHL. All Tower to be Painted (C5) & towers inside MOD & CAA shall have Gray, Red & White paint. Modifications to existing LV/MV overhead lines. Site testing and commissioning works as specified in the OETC standard. Supply of spares and tools.